Can you imagine us in a tropical
lagoon, lying on the deck of Bel Canto, the boat gently
rocking in the breeze, as we watch the the man-of-war birds swooping
over the palm trees on shore and sip our rum and pineapple juice
concoctions, the faint sounds of reggae from the natives wafting over
the bay? Or perhaps ghosting along over gentle ocean swells, the
white sails looking like a seabird's wing extending up over the blue
hull, listening to the murmur of the wake as the boat cuts through
the water.
That's not us. The boat is in the
boatyard, on dry land, propped up on jacks, while her mast lies 200
Bel Canto "On the Hard" and unmasted |
Looking over the rigging, we were
convinced that David was right about most, if not all, of it. The
inner forestay, a cable that runs from the deck in front of the mast
about 2/3 of the way up the mast and to which the staysail is
attached, was half severed at the upper end. This stay isn't
essential for holding the mast in place, but two of the shrouds
holding the mast latterly had broken strands, and many of the other
stays, while seeming sound, showed rust. We decided that the prudent
thing to do was to follow David's recommendation and replace all of
the standing rigging that was original with the boat, hoping that
when it came time to sell the boat, this would be a strong selling
point.
Dave and Jim examining the rigging |
Angie: We met Dave at the boatyard on
Saturday morning to help him remove the rigging and measure it to
order new. If we hadn't done it he would have had to hire someone
else, so we figured between us we were earning $25 an hour. That's
better than we had been making. Part of our job was removing the halyards (used to raise the sails) and
topping lifts (used to control the boom and spinnaker pole) from the
mast. These run up inside the mast, so we had to run messenger lines
up as we pulled them out so that we'd be able to get the new ones
back where they belonged. While we worked, we talked (can you
imagine?), and I learned all about Dave. He is descended from
Afrikaners, the Dutch settlers in South Africa. They spoke a form of
Dutch called Afrikaans, and some of Dave's speech patterns and
sayings come from that. For instance, he said that if we were to put an
eye splice in the end of one of the lines, it would end up looking
like a pig's breakfast. The Afrikaners hated the English South
Africans, who they thought were trying to gobble up everything for
themselves. Dave's mother is English, straight from England, so I
guess his father got over the hating. It was fun working with Dave.
He has an upbeat personality and makes us feel better about all of
the work we are doing. He's says she's a beautiful boat and we'll
have great fun with her when we get these major jobs out of the way.
Getting the prop ready to paint |
Getting back to Annapolis enabled us to
coordinate the work that still had to be done on the boat. We talked
to Ann Miller, who was supervising the bottom painting, and Sean, who
came out to measure for the new dodger (he's also making the new
cushions for the vee birth). And when we saw the mast down, we
decided we needed all new wiring that runs up inside the mast to and
from the mast lights, the radar, the wind instruments, and the
radio/tv antenna. Some of these were undersized for the length of the
mast, and some showed signs of wear and were liable to fail. So we
got hold of an electrician and went over all the electrical jobs to
be done with him. Chris Oliver, the engine guy, came and finished
working on the engine, except for a few tests and adjustments that
have to be done once the boat is back in the water.
Cutting line for new fenders |
Angie: Meanwhile we continued putting
our things on the boat and trying to get it settled. This is really
hard, because the vee birth is full of sails, and the solar panel,
which came off the dodger so that it could be measured, is lying in
the quarter birth. These are the two main cabins of the boat, and it
makes it hard to settle these areas. And the galley is still
partially disassembled, because you have to take that apart to get at
the engine. Everything that goes on the boat has to come up the 15
foot ladder. I must climb the ladder 20 times a day. I don't think
I've been on a ladder that many times in my whole life before, but
I'm getting used to it.
In fact, I started cleaning and repairing a
section of the rub rail that runs around the hull. To do that, I had
to keep moving the ladder around the boat in addition to climbing up
and down. It's no wonder that I'm exhausted at the end of the day! In
my spare time (like when we're traveling back and forth to work in
the car) I practice tying knots. I learned some essential sailor
knots when we were on Escapade, but I'm more into it
now. Jim just taught me how to tie a clove hitch around a piling. He
said that when I get really good at it I'll be able to tie it around
the piling from six feet away, and that will impress everybody. I've
seen him do it, but I'm not sure I'll ever be able to.Steamed dumplings at Lemongrass |
Two jobs we still have to get done
before the boat hits the water is to repack the stuffing box and to
fix a switch on the automatic bilge pump. The stuffing box is what
keeps the water from gushing into the boat where the propeller shaft
goes through the hull, and the bilge pump is, of course, what pumps
out the water that does seep in. The list seems to go on forever, but
we are making progress, little by little. And we passed one huge
milestone. Just before we left Annapolis, the graphics people came
out to put the new name on the boat. And yesterday we heard from the
Coast Guard that the documentation, which makes the name official and
also certifies her as our boat, was just completed. Here she is.